Skip to main content

2 posts tagged with "end date"

View All Tags

Clear the End Date: Switch the Scheduler Back to Fastest Mode

· 4 min read

Score7's auto-scheduler has two modes, and the End Date field is the switch between them. Type a date in: the scheduler spreads matches evenly across the window. Leave it empty: it packs matches into the earliest slots and respects your rest-time and gap settings.

The catch used to be that once you typed a date, there was no obvious way back. Now there is — an X icon inside the field clears it in one click.

Spread Matches Evenly Across a Date Range

· 5 min read

You set a Start Date, enabled Mondays as your match day, added a couple of pitches, and hit generate. Score7 built the schedule — and crammed every match into the first Monday. If you're running a league that's supposed to last a season, that's not what you want. You want the matches spread across the window.

The fix is the End Date field in the scheduler. Set it and Score7 switches from "pack matches as early as possible" to "spread matches evenly across the available days."